Facility Assessments

Facility Assessments typically include reviewing building functionality to determine if owner needs are being met, reliability analysis of physical infrastructure, optimization of infrastructure performance, guidance for maintenance and operations and can be a great cost savings to the building's owner.

JMT has a large staff of professionals that have conducted many such assessments for facilities throughout the mid-Atlantic region. The sizes of such facilities range from a 3,500 square foot building to a 1,225,000 square foot complex.  Several projects progressed from assessment, remedial recommendations through to design. Examples include roof replacements, building insulation upgrades, window replacements, structural steel upgrades, upgrades to site access, foundation repairs, air handling unit replacements, chiller and pumping system replacements, solar energy harvesting, boiler system upgrades, and the installation of geothermal heating and cooling systems.  These experiences are in a variety of facilities including libraries, offices, maintenance, buildings, municipal, medical, and administrative headquarters.  JMT can identify issues of concern whether they are to the physical structure or the way the structure is being utilized and will identify all reasonable recommendations for resolution.  Our focus is on the most prudent means to protect and improve on the performance of the facility.  Through the diverse in house recourses of our Facilities Management Staff supported by our Architects, Structural, Mechanical, Electrical, Site Civil, Geotechnical Engineers and Surveyors, JMT conducts Energy Efficiency Assessments, Green Building guidelines, LEED┬« analysis, Life Cycle Cost Analysis, Commissioning and Retro-Commissioning, operational and maintenance training programs, and life cycle replacement programs. 

Projects

Locust Point Marine Terminal Structural Design

Locust Point_03_m

Baltimore, Maryland

JMT provided structural roof design of an existing warehouse building to support photovoltaic solar panels in its conversion to the City of Baltimore's passenger cruise terminal.

Read More »

Hereford High School Systems Renovation

Hereford_05_m

Parkton, Maryland

JMT provided mechanical, electrical, plumbing, and fire protection engineering associated with the systemic renovation and expansion of this school.

Read More »
VA_Soc_01_s

VISN 4 Statement of Conditions Surveys

JMT conducted a Statement of Conditions survey at nine VISN 4 facilities to assist in the preparation for the triennial Joint Commission accreditation surveys.

Read More »
bge_03_s

BGE LEED Facility Assessments

JMT worked with the Baltimore Gas & Electric Company (BGE) to develop a LEED® master plan for utilization on all of its facilities.

Read More »
dcps_davis_02_s

DC Public Schools Facility Assessments

JMT performed thorough comprehensive assessments of forty elementary schools and associated middle schools.

Read More »
iwif_01_s

Injured Workers Insurance Fund Building Renovations

JMT designed the complete architectural and engineering interior reconfiguration and renovation for this four-story, 90,000 sf headquarters building with three-level parking garage. 

Read More »
707_2_s.jpg

SHA Headquarters Complex Systems Renovation

JMT developed construction documents for mechanical and electrical modifications to the SHA Headquarters Building.

Read More »