Turnpike Mainline at I-4 and Resurfacing Mainline
Turnpike Mainline at I-4 and Resurfacing Mainline
JMT is providing construction inspection services for the construction of direct connectivity ramps from the Turnpike Mainline (SR 91) to and from I-4 (SR 400) to improve traffic operations and safety at the interchange.
Six existing toll sites within the project limits will be replaced with the implementation of All Electronic Tolling (AET). The project also includes of express lanes on the Turnpike Mainline between the Beachline (SR 528) and I-4 and operational improvements at the Consulate Drive southbound off-ramp with AET and intersection improvements.
Miscellaneous roadside improvements and pavement milling and resurfacing will also be provided on the Turnpike Mainline from Orange Blossom Trail (US 441) to I-4, as well as the milling and resurfacing of portions of the mainline pavement currently being constructed south of SR 528 and portions of the Turnpike Mainline north of I-4.